These past few of weeks have been hectic, to a crazy degree. We have crews working on the house six days a week, usually a number of them at the same time. It seems like that is how it is supposed to be, but it wasn’t until now.
Our original move-in date of August 1 has past already. The new move-in date is August 15 – this Friday and it’s set in stone: our apartment is being packed, the movers were invited, and everything will be ready.
In the past four weeks we saw electricians, carpenters, A/C installers and ironsmiths work side by side one day, and tile setters, (different) carpenters, door installers and plumbers the next. Coordination, timelines, cajoling, even applied pressure became the central elements of our day, interwoven into our regular activities that kept on going as usual.
A square meter of missing tile or a worker who did not show up were part of the pressure applied on us.
In the midst of it all, Gali is already nine months pregnant and I, just a week before move-in day, flew out to Mumbai for work (I’m writing this post at Zurich Airport on my way back home).
We now have stairs, water, lights, windows and doors (not to be taken for granted!), banisters, even a deck, trees and grass.
In the remaining days the parquet floor will be installed, a last coat of paint will be applied, the front door will be fixed, last bathroom fixtures installed and the house will be cleaned.
Come Friday, we are in!
PS – To our reader Uri: turns out that transfers to India do need to go through border control in Vienna. I hope you got to your flight on time.
baruchin@btinternet.
August 20th, 2008 at 18:23
strange…
Anyway – I barely made it, they were calling my name…